JYSK Radomsko, Poland

Future-proofing of large distribution centre for JYSK

A central warehouse of 45,800 m² was opened in June 2007. The building stretches for no less than 500 metres and contains a terminal building with 72 gatehouses. The length of the building is broken up by an administration building with offices, changing facilities and canteen.

In 2010 the goods terminal, the changing facilities and the offices were extended and 2 high bay warehouses of 40 metres with a total capacity of 60,000 m² were erected. The high bay warehouses are fully automatic, whilst the storage racks make up the hall’s load-bearing structure. They are designed with a variable, sporadic pattern in two hues of silver that can be recognised from many of JYSK’s warehouses. This architectonic expression is designed to break up the large volume with a diffuse pattern on the facade.

Location:
Radomsko, Poland

Category:
Distribution, High bay, Logistics

Discipline:
New build

Client:
JYSK

Engineer:

Contractor:
Skanska etape 1 and GSE etape 2

Area:
105,800 m²

Completion:
2006 + 2010

Location:
Radomsko, Poland

Category:
Distribution, High bay, Logistics

Discipline:
New build

Client:
JYSK

Engineer:

Contractor:
Skanska etape 1 and GSE etape 2

Area:
105,800 m²

Completion:
2006 + 2010

,

Want to know more about the project?

Contact person

Jørgen Mogensen

CFO, Partner, ATCM

Afdeling: Aalborg

jm@norrplan.dk

t: +45 9877 2619

m: +45 2041 5077

Related projects

  • Simple Design Intervention with Impact

    Catena Logistics Centre on Indusvej, Køge

    industry, logistics

  • Future Industrial and Innovation Campus in Hedeland

    Everllence – The Valley Campus, Roskilde

    industry, logistics, production

  • Expansion of Hørkram Foodservice’s logistics center in Aarhus

    Hørkram Foodservice Logistics Centre, Aarhus

    industry, distribution, food storage, cold and freezer, logistics